Scopes of work

Five scopes, laid out the way a schedule of work is laid out. Each has its own unit prices, its own list of things that have to be defined before anybody can price it, and its own answer to the question of what carries the flow while the work happens.

W, Potable water SS, Sanitary sewer APWA uniform colour code

Four of these five scopes are things most civil contractors do. The fifth — rebuilding a plant while it keeps meeting its permit — is the one that decides whether the other four were worth buying from the same firm.

Nearly every municipal water and wastewater project in Colorado is a retrofit. Districts do not build new plants often; they expand, upgrade and replace the plants they have, usually because a permit limit tightened or the population grew. So the work arrives as a new structure plus a tie-in, a pipeline plus a shutdown, a pump station plus a bypass. The second half is where the risk is.

That is why these five are one list rather than five separate offerings. The excavation crew that opens the trench, the carpenters who form the wall, the pipe layers and the operators who run the bypass are the same crew list, which is what makes it possible to sequence the work around a live plant instead of around four subcontractors' calendars. See what we self-perform.

How to read the colour

Blue and green on this site are not brand colours. They are the APWA uniform colour code — the same code that gets painted on a street before anyone digs.

Blue
Potable water, APWA code W
Green
Sanitary sewer and drain, APWA code SS
White
Proposed excavation — the page ground

They identify what is in a pipe and nothing else. They are never used to mean important, or new, or good. That constraint is the whole visual system.

B 0.2 The schedule of work

Five scopes, each with a price

Typical spans are planning ranges for a scheduling conversation and assume a normal procurement path and workable weather.

01 W/SS, Water and sewer

Treatment Facilities

New water and wastewater treatment structures and process systems, from excavation and cast-in-place concrete through mechanical installation, commissioning and operator training.

You receive
Commissioning and startup records, O&M manuals, operator training
9–24 months
02 W/SS, Water and sewer

Retrofit on Operating Plants

Rebuilding a process train while the plant keeps meeting its permit. Bypass pumping, staged demolition, tie-ins scheduled at low flow, and a written procedure for every hour the plant is vulnerable.

You receive
Bypass plan, shutdown and tie-in procedures, as-built record
3–18 months
03 W/SS, Water and sewer

Water & Sewer Pipelines

Gravity sewer, water mains and force mains in open cut and by trenchless methods, including the surface restoration that is what a resident actually sees when it is finished.

You receive
Pressure and leakage tests, CCTV inspection, record drawings
4 weeks–8 months
04 SS, Sanitary sewer

Lift & Pump Stations

Wet wells, valve vaults, pumps, piping, electrical and controls, and the standby power that decides what happens to a collection system when the grid goes down.

You receive
Commissioning record, control narrative verification, O&M manuals
4–12 months
05 W, Potable water

Structures & Site Civil

Cast-in-place water-retaining concrete, vaults, tanks, headworks, grading, drainage and restoration — the civil scope that everything mechanical is bolted to.

You receive
Concrete test records, hydrostatic testing, record drawings
6 weeks–10 months

The span for your project comes from a schedule built against a defined scope. Every scope page publishes the unit prices for that scope; the whole sheet, by division, is on the unit price page.

B 0.3 Right and wrong fits

What we are the right contractor for

Worth reading before you invite a bid, because the wrong fit costs you a procurement cycle and costs us a bid we should not have submitted.

Project fit · stated plainly rather than implied
Project Fit Why
Process train rebuilt on a live plant Right The sequence, the bypass and the tie-in are the project, and they are self-performed
New treatment structure or plant expansion Right Water-retaining concrete, process piping and commissioning are our own crews
Collection or distribution system replacement Right Pipe, manholes, services and restoration in one crew list, with the street back quickly
Lift station replacement or rehabilitation Right Wet well, pumps, controls and standby power, with the alarm path tested end to end
A single residential water or sewer connection Wrong A local utility contractor will do it faster and cheaper; we would be the expensive answer
Building construction with a utility scope attached Wrong A building general contractor should hold that, and we are happy to be their civil sub
A project so large we would broker most of it Wrong Self-performance is the argument; a project that defeats it defeats the reason to hire us

The last row is the uncomfortable one and it is the one worth trusting. A crew list is a fixed capacity, and a firm that tells you it is the right size for everything is telling you something about its sales process rather than about its crews.

Describe the facility and the constraint

What it has to do, what it does now, what the permit requires, and what can be taken out of service and for how long. That last one is usually the tightest constraint on the whole project and the one least often established before a bid goes out.